LAW TO PROMOTE PRIVATE INITIATIVE IN ENERGY GENERATION

The “Law to Promote Private Initiative in Energy Generation” (the “Law”) was published on October 28, 2024, in Official Gazette Supplement No. 673. The Law aims to encourage private investment in renewable energy generation to help overcome the country’s energy crisis.

Below is a summary of the Law:

  1. Transitional generation is defined as “…non-renewable generation technologies with low environmental impact, which allow for a gradual transition of the energy matrix.”
  1. Concession contracts may be backed by guarantees to be defined in the regulations of the Law.
  1. The collection and payment for regulated demand transactions shall be carried out according to the priority order set by the Energy Regulation and Control Agency (“ARCONEL”). Distributors may establish a trust to ensure compliance with this priority order.
  1. Installed assets for self-supply, self-generation, cogeneration, and unconventional renewable energy generation up to 10 MW will not revert to the State.
  1. For priority projects listed in the Master Electricity Plan (“PME”), the Ministry of Energy and Mines (“MEM”) will conduct public selection processes.
  1. If a renewable or transitional energy project is identified by the private sector, is not included in the PME, and has a capacity of less than 100 MW, it may be developed by the proponent with prior authorization from the MEM. For larger capacities, delegation through a public selection process will be required.
  1. Priority and preferential pricing will be given to private projects up to 100 MW that promote the use of clean technologies and unconventional renewable energy with storage capacity and interconnection networks.
  1. Only unconventional renewable energy projects up to 10 MW will be granted priority dispatch and preferential pricing.
  1. The MEM must include legal stability clauses in all contracts with public or private entities, considering the central and local taxes in effect at the time of contract signing.
  1. Private projects with a 10 MW limit, either in the permitting phase or in operation, may request permit reviews or power adjustments, respectively, to comply with the new limits of the Bill.
  1. The holder of the concession contract resulting from a PPS may utilize mechanisms to guarantee payment to their financiers or creditors, who may enter into direct agreements with the granting entity to ensure the continuity of the project. Step-in rights in favor of financiers and creditors will be established in the Law’s regulations.
  1. Thermoelectric generators must present transition plans to clean technologies, including natural gas use, and develop hybrid projects combining thermal and renewable energy. The State will facilitate the granting of licenses for natural gas imports.
  1. Legal entities established in the country may import natural gas for self-consumption in productive processes or to generate electricity.
  1. Public and private banks may offer financial products or loans with preferential rates to individuals and legal entities seeking to implement self-supply energy generation systems (“Self-Supply Systems”) using renewable sources.
  1. Beneficiaries of Self-Supply Systems may sell any surplus energy generated.
  1. Decentralized Autonomous Governments must implement waste management systems, including waste processing for energy generation to be sold to the National Interconnected System.
  1. By December 13, 2024, ARCONEL and MEM must issue the necessary regulations for implementing the Law.
  1. By November 27, 2024, the Hydrocarbon Regulation and Control Agency and MEM must issue regulations for the importation of natural gas for generation or self-generation projects.
  1. By November 27, 2024, distributors must sign regulated contracts with the concessionaires of PME projects with the respective concession contracts.
  1. By January 28, 2025, MEM must call for tenders for the exploitation and repowering of identified natural gas fields.

 

Carlos Torres, Senior Associate at CorralRosales
ctorres@corralrosales.com
+593 2 2567676

Mario Fernández, Associate at CorralRosales
mfernandez@corralrosales.com
+593 2 2544144

 

© CORRALROSALES 2024
NOTE: The previous text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused as a result of having acted or stopped acting based on the information contained in this document. Any additional determined situation requires the specific opinion and concept of the firm.

CORRALROSALES

SUSPENSION WORKDAY SUSPENSION ON OCTOBER 31

On October 25, 2024, the President of the Republic issued Executive Decree 438, whereby the following was established:

  1. To suspend the working day for the public and private sector on October 31, 2024.
  1. That the public sector will recover its working day through an additional hour during the subsequent working days.
  1. That the private sector may recover its working day in the same way as the public sector.
  1. On October 31, 2024, the entities and agencies of the public sector shall guarantee the provision of public services.

In our opinion, the private sector, by mutual agreement between the employer and the employee, may determine how to execute the working day or how to compensate it.

 

Edmundo Ramos, Partner at CorralRosales
eramos@corralrosales.com
+593 2 2544144

© CORRALROSALES 2024
NOTE: This bulletin is for informational purposes only. CorralRosales shall not be liable for any loss or damage resulting from acting or failing to act based on the information contained herein. For any specific situation, it is recommended to obtain the corresponding legal opinion.

CORRALROSALES

Resolution No. SPDP-SPDP-2024-0013-R.

On October 25, 2024, the Data Protection Authority (“SPDP”) issued Resolution No. SPDP-SPDP-2024-0013-R, enacting the Regulation on the Submission and Processing of Complaints and Requests for Data Protection (“Regulation”).

The main points are below:

  1. Purpose and Scope of the Regulation

The Regulation governs the submission and processing of complaints and requests before the SPDP following the principles of expeditiousness, lawfulness, timeliness, transparency, good faith, objectivity, effectiveness, efficiency, and quality.

This Regulation applies when:

  • The exercise of the data subjects’ rights has been violated.
  • Data protection principles have been breached.
  • The data controller or processor has failed to comply with obligations set forth in the data protection regulatory framework.
  1. Complaints and Requests
  • Complaint: A mechanism by which an individual or an entity notifies the SPDP of an alleged violation of data protection regulations, such as the improper use of personal data, security breaches, or unlawful practices.
  • Request: A petition filed by a data subject to address a specific issue related to processing their personal data, such as a lack of response or improper data handling. The objective is to request that the controller or processor correct their actions, recommend corrective measures, or initiate an administrative sanction procedure.
  1. Submission of Complaints and Requests

Complaints and requests may be submitted physically at the SPDP offices or electronically through the channels made available.

  1. Complaint Procedure

Once a complaint is submitted, the SPDP may initiate preliminary actions or impose provisional protective measures to safeguard the data subject’s rights. These measures may include:

  • Withdrawal of products, documents, or other goods.
  • Access limitations or restrictions.
  • Removal of individuals.
  • Suspension of the processing activity.
  • Closure of establishments.

During the preliminary proceedings, the SPDP will:

  • Identify the alleged perpetrator(s).
  • Establish the specific circumstances of the case.
  • Determine relevant contributing factors.
  • Assess whether sufficient grounds exist to initiate an administrative procedure.

If necessary, the SPDP may order further investigations, inquiries, audits, or inspections to clarify the facts. The administrative act initiating the preliminary action will be notified to the investigated party in accordance with the Administrative Code (“COA”).

Once the preliminary actions are completed the SPDP will issue an initial report which will be notified to the investigated party. The party will have ten working days from the date of notification to submit its response.

If no response is provided within the given term, the preliminary report will have full legal effect and become the final report, concluding the initial actions.

The SPDP has a maximum of six months from the issuance of the administrative act to decide whether to initiate an administrative sanctioning procedure.

  1. Request Procedure

Requests submitted by data subjects must meet the requirements established in the Regulation. If the request is incomplete or unclear, the SPDP will order the petitioner to amend or clarify it within five days of notification. Failure to do so will result in the request being archived.

The SPDP will assess whether the request falls within its jurisdiction and, if necessary, may open a thirty-day evidentiary period during which the data subject and controller may submit additional evidence.

Within twenty days following the conclusion of the evidentiary period, the SPDP will issue a report that may contain:

  1. A recommendation on whether or not to initiate an administrative sanction procedure.
  2. A recommendation regarding the corrective measures to be implemented.

Corrective measures and administrative sanction procedures will be governed by the provisions of the COA, Data Protection Law, the Regulations to the Data Protection Law, and any other applicable regulations issued by the SPDP.

The Regulation came into effect on October 25, 2024.

 

Rafael Serrano, Partner at CorralRosales
rserrano@corralrosales.com
+593 2 2544144

© CORRALROSALES 2024
NOTE: This bulletin is for informational purposes only. CorralRosales shall not be liable for any loss or damage resulting from acting or failing to act based on the information contained herein. For any specific situation, it is recommended to obtain the corresponding legal opinion.

CORRALROSALES

WORKING DAY MODIFICATION AGREEMENTS: REGISTRATION PROCEDURE (ELECTRIC PICO Y PLACA)

On October 22, 2024, the Ministry of Labor issued the Ministerial Agreement No. MDT-2024-200, hereinafter the “Agreement”. We highlight the following:

  • The Agreement could be applied by employers of the private sector that require a temporary modification of the working day due to the national electric emergency.
  • The modification of the working day must be implemented by means of a written mutual agreement between the employer and the employees and must be registered in the SUT system within 30 days after the signing of the agreement.
  • The modification of working hours should adjust to the following:
    1. Employees shall be entitled to a rest of 72 continuous hours.
    2. Employees could agree to a working day from 7:00 a.m. to 5:00 p.m. on Mondays, Tuesdays, Wednesdays and Thursdays or a working day from 7:00 a.m. to 5:00 p.m. on Thursdays, Fridays, Saturdays, and Sundays.
    3. Shifts that exceed 40 hours per week shall be paid as overtime.
  • The modification of the working hours can be terminated either by agreement of the parties or automatically by the end of the energy crisis.
  • The system will be enabled for the registration of the working day modifications within 10 days from the date of the Ministerial Agreement.

 

Edmundo Ramos, Partner at CorralRosales
eramos@corralrosales.com
+593 2 2544144

 

María Victoria Beltrán, Senior Associate at CorralRosales
mbeltran@corralrosales.com
+593 2 2544144

 

© CORRALROSALES 2024
NOTA: The previous text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused as a result of having acted or stopped acting based on the information contained in this document. Any additional determined situation requires the specific opinion and concept of the firm.

CORRALROSALES

FREE TRADE ZONE INVESTOR KIT

The Ministry of Production, Foreign Trade, Investment, and Fisheries has published the Free Trade Zone Investor Kit, which contains the instructions for requesting approval for Free Trade Zone projects and Operator´s qualifications.

Below is a list of the documents that must be submitted in both physical and digital formats:

  1. Application form for Free Trade Zone declaration and Operator User qualification, which must include the following documents:
    1. Certificates of compliance issued by the Internal Revenue Service, the Ecuadorian Social Security Institute, and the Superintendence of Banks or the Superintendence of Companies, Securities, and Insurance, as applicable.
    2. Documents required for approval as an Operator of a Free Zone Trade:
      1. By-laws of the company which must indicate that its corporate purpose is the execution of Free Trade Zone activities;
      2. Taxpayer Registration Certificate (RUC);
      3. Appointment Document and ID card of the legal representative.
      4. Notarized Sworn statement declaring that the applicant has not previously been an operator or administrator of a free trade zone whose authorization has been revoked due to a sanctioning procedure. and,
      5. Documents that display the financial capacity of the applicant.

       

  1. Master Development Plan Report form, which must include:
    1. Technical report on the project location, execution timeline, land plans, project layout and design, identification of sustainable development goals (SDG), environmental study or license, and details of potential users and support services.
    2. Economic report that covers social, economic, and productive indicators, generation of economies of scale, socioeconomic aspects, job creation details, financial projections, economic and financial evaluation, and project’s financial structure and capacity.
    3. Market report regarding expected participation in local and international markets, market strategy, and its relation to potential users, business model, potential competition, and a preliminary list of imports.
  1. Annex form to the Master Plan, which must include:
    1. Operator´s investment schedule;
    2. SDG compliance schedule; and,
    3. Employment generation schedule.

     

  1. Request index referencing the location of each document.

The forms and instructions are available at the following URL.

Fernanda Inga, Senior Associate at CorralRosales
finga@corralrosales.com
+593 2 2544144

© CORRALROSALES 2024
NOTA: The previous text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused as a result of having acted or stopped acting based on the information contained in this document. Any additional determined situation requires the specific opinion and concept of the firm.

CORRALROSALES

Breeders’ Rights – Overreach of Indigenous Justice – JUDGMENT 4-20-EI/24

DETAILS

DATE: 10-21-2024

By Judgment 4-20-EI/24 (“Judgment”), issued on August 29, 2024, in case 4-20-EI, the Ecuadorian Constitutional Court (“Court”) accepted the constitutional action filed by the Ecuadorian IP Office (“SENADI”) against the Resolution of Indigenous Justice No. 003-CPKA-2020 (the “Resolution”), issued by the Kayambi People Confederation. The Court stated that the Resolution restricted SENADI’s competencies regarding compliance procedures for the non-payment of royalties for using protected breder´s rights in Ecuador, establishing that Indigenous Justice lacked jurisdiction and exceeded its decision scope.

The Resolution ordered, among other aspects, that breeders could modify and renegotiate licensing contracts for breeder´s rights prohibited SENADI from conducting administrative inspections of such rights within the Kayambi territory, and compelled SENADI to adjust the rates for Intellectual Property proceedings. The Resolution also urged the Competence Agency to analyze the existence or absence of economic concentration.

SENADI challenged the Resolution through a constitutional action, arguing that its rights were affected by not being served or participating in the Indigenous trial and that the Resolution contained measures interfering with SENADI’s competencies. The Court stated that by Article 65 of the Constitutional Law (LOGJCC), any person or community affected by Indigenous Justice decisions can challenge them before the Constitutional Court, including state institutions whose procedural rights or legal competencies have been harmed, thus reaffirming SENADI’s active legitimacy.

The Judgment analyzed if the Resolution complies with the requirements to be challengeable: (i) if it comes from an indigenous authority acting in the exercise of its jurisdictional functions and (ii) if it refers to an internal conflict in which its laws and proceedings have been applied. The Court concluded that even though the Kayambi People Confederation acted as an indigenous authority with its rights and issued the Resolution in an “Indigenous Jurisdictional Assembly,” it overstepped and exceeded its jurisdictional scope since it did not resolve an internal conflict of the community. By failing to meet the requirements, the Resolution illegally established broad regulation over the commercial situation of flower production without clarifying how this dynamic relates to and affects the community’s values and the coexistence among its members.

Disposition of energy intake cuts for the industrial sector

On October 5, 2024, the Ministry of Energy and Mines, by means of Official Communication No. MEM-SDCEE-2024-0710-OF, ordered the reduction of energy intake for the industrial sector; hereinafter the “Disposition”. In this regard we mention:

  • The Disposition orders the industrial sector to not consume energy for at least 15 days between 08h00 and 18h00.
  • Article 60 of the Labor Code provides:

Art. 60.- Recovery of working hours. – When work is interrupted due to accidental or unforeseen causes, force majeure or any other reason beyond the control of employers and employees, the employer shall pay the remuneration, notwithstanding the following rules:

  1. The employer has the right to make up for the time lost by increasing up to three hours of the following workdays, without being obliged to pay the surcharge;
  1. Said increase shall last until the excess hours are equivalent in number and amount of remuneration to those of the period of interruption;
  1. If the employer keeps the employees in the establishment or factory until labor is renewed, he shall lose the right to the recover the lost time, unless the surcharge on the remuneration corresponding to the supplementary hours is paid in accordance with Article 55, rules 2 and 3 of this Code;
  1. The employees who don’t adhere to the supplementary work hours shall repay the employer for the received remuneration corresponding to the interruption time; and,
  1. The lost time recovery is only demandable from the employees prior authorization of the labor inspector, before whom the employer shall submit a request detailing the date and cause of the interruption, the number of hours it lasted, the remunerations paid, the modifications to be made in the schedule, as well as the number and determination of the persons to whom the time surcharge must be applied.”
  • In our opinion, and if the Labor Ministry does not publish application instructions to the Disposition, employers in the industrial sector forced to suspend their work may apply the mentioned article if there is an agreement with the employees. Without the existence of an agreement employees must apply the norm as provided in numeral 5.

 

Edmundo Ramos, Partner at CorralRosales
eramos@corralrosales.com
+593 2 2544144

 

María Victoria Beltrán, Senior Associate at CorralRosales
mbeltran@corralrosales.com
+593 2 2544144

 

© CORRALROSALES 2024
DISCLAIMER: The previous text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused as a result of having acted or stopped acting based on the information contained in this document. Any additional determined situation requires the specific opinion and concept of the firm.

CORRALROSALES

Bill to promote private initiative in the renewable energy transition

On September 30, 2024, the President of the Republic submitted the ” Law to Promote Private Initiative in the Renewable Energy Transition” bill (the “Bill”) to the Legislature. It is classified as urgent in economic matters and must be processed within 30 calendar days.

Below are the key points of the Bill:

  • The State will establish specific incentives for private investment projects in electricity generation using non-conventional renewable sources (e.g., solar, wind, geothermal, biomass, tidal, and small-scale hydroelectric). The Bill does not specify these incentives.
  • Electric distribution and commercialization companies can enter into long-term Power Purchase Agreements (PPA) with private generators, backed by State guarantees or trusts.
  • For priority projects outlined in the Master Electricity Plan (“PME”), the Ministry of Energy (“MEM”) will conduct public selection processes.
  • Private projects not included in the PME and under 100MW may be developed with prior MEM authorization. Private projects over 100MW will require public selection for delegation.
  • The State may grant special incentives to private investors for projects with a high-capacity factor and based on non-conventional renewable energy. The Bill does not specify these incentives.
  • Approval from the Ministry of Finance is necessary to provide incentives, such as exemptions, tax privileges, or state obligations that are not budgeted and affect the General State Budget.
  • Thermoelectric generators must present transition plans to clean technologies, including natural gas use, and develop hybrid projects combining thermal and renewable energy. The State will facilitate the granting of licenses for natural gas imports.
  • Private projects with a 10 MW limit, either in the permitting phase or in operation, may request permit reviews or power adjustments, respectively, to comply with the new limits of the Bill.

 

Carlos Torres, Senior Associate at CorralRosales
ctorres@corralrosales.com
+593 2 2567676

Mario Fernández, Associate at CorralRosales
mfernandez@corralrosales.com
+593 2 2544144

 

© CORRALROSALES 2024
DISCLAIMER: The previous text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused as a result of having acted or stopped acting based on the information contained in this document. Any additional determined situation requires the specific opinion and concept of the firm.

CORRALROSALES

0% VAT rate for electric generators

By means of Executive Decree No. 411, issued on October 3, 2024, and published in the Fourth Supplement of Official Gazette No. 658 on October 4, 2024, the President of the Republic reformed -for the purposes of VAT- the definition of “electric energy,” including the import and local sale of electric generators in all their forms and ranges, as well as their parts and components. As a result, the import and sale of electric generators will be subject to a 0% VAT rate.

According to Article 11 of the Tax Code, this reform should apply starting from November 1, 2024. However, the Executive Decree mandates that the reform be implemented immediately.

 

Andrea-Moya-abogados-ecuadorAndrea Moya, Partner at CorralRosales
amoya@corralrosales.com
+593 2 2544144

© CORRALROSALES 2024
NOTE: The above text has been prepared for informational purposes. CorralRosales is not responsible for any loss or damage caused by actions taken or not taken based on the information contained in this document. Any specific situation requires the specific opinion and advice of the firm.

CORRALROSALES

Report Task Force on Legal Representation of American States in Investment Arbitration

DETAILS

DATE: 10-02-2024

PROFESSIONALS INVOLVED IN THE ARTICLE:

Hugo García Larriva

MEDIA:

– Institute for TRANSNATIONAL ARBITRATION

Report “Task Force on Legal Representation of American States in Investment Arbitration,” developed as part of the Americas Initiative by the Institute for Transnational Arbitration (ITA).

This project sheds light on how the legal representation of American States is structured and managed in investment arbitration. It highlights current practices, recruitment processes, and key priorities, offering valuable guidance to law firms seeking to represent States in these complex disputes.

Download the article here.